Thanks - for me it's no big problem so no rush - but there may be others that run into the same problem and plan to do a July 4th showing.
The work around is to drop back to Version 2 Build 0.. This is what's working for me.
As I'm constructing sone of the things for my 2008 xmas display (arches, talking snowman, etc) I've been setting stuff up in my basement and testing - (Looks like a Christmas light bomb exploded when I do this).. Found that using the scheduler allows me to sit back and see how a particular part of the display will look in all my sequences and not have to run back and forth from computer upstairs to display setup in basement.
Other than this minor 'bug' everything has been working great!
|
|
|
|
LightsOnLogan
Admin Group Joined: 11 Oct 2007 Online Status: Offline Posts: 3187 |
Quote Reply Posted: 18 Jun 2008 at 12:46pm |
I'll check this out and attempt to get a scheduler patch out this week so that this does not interfere with the July 4 shows. |
|
bdkeen
Beta Testers Joined: 31 Dec 2007 Location: Easton,PA Online Status: Offline Posts: 380 |
Quote Reply Posted: 13 Jun 2008 at 12:02pm |
Somewhere between .2 and .4 seems like my scheduler stopped talking to the com port. I run on com 4. It used to work. Aurora plays sequences through the network 1, com 4 just fine. The scheduler starts the schedule ok but appears as if it not talking to the com port and no lights.
To test I reverted back to 2.0 build of the scheduler and that works.
|
|
|
|