|
Can the schedule be edited while show is playing. |
Post Reply |
Author | |
breakbenj
Pre-Order User Joined: 21 Dec 2007 Location: Georgia Online Status: Offline Posts: 102 |
Quote Reply
Topic: Can the schedule be edited while show is playing. Posted: 14 Dec 2008 at 7:41pm |
That's What I thought. i just stopped it and removed the sequence and set it up to resume at 8:45. Thanks
|
|
Jeff
|
|
Jonathan
Beta Testers Joined: 07 Sep 2008 Location: SoCal Online Status: Offline Posts: 1237 |
Quote Reply Posted: 14 Dec 2008 at 7:30pm |
I've never successfully done it. Each time the show schedule window (new or existing) is opened, the lights stop receiving commands. You then have to stop the scheduler, and restart it to get it going again.
I only make changes when my show loop has ended but before the next one begins. I've got it set up so that there are 30 seconds in between shows with just the lights on. If you time it right, you can get away with it. |
|
~Jonathan
|
|
breakbenj
Pre-Order User Joined: 21 Dec 2007 Location: Georgia Online Status: Offline Posts: 102 |
Quote Reply Posted: 14 Dec 2008 at 7:16pm |
Can the schedule be edited while show is playing without interupting the show. I need to remove a sequence but I don't want to stop the show.
|
|
Jeff
|
|
Post Reply |
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |