Aurora Homepage
Forum Home Forum Home > Aurora Sequencer Software > Aurora 1.0
  Active Topics Active Topics
  FAQ FAQ  Forum Search   Calendar   Register Register  Login Login

Can the schedule be edited while show is playing.

 Post Reply Post Reply
Author
Message Reverse Sort Order
  Topic Search Topic Search  Topic Options Topic Options
breakbenj View Drop Down
Pre-Order User
Pre-Order User
Avatar

Joined: 21 Dec 2007
Location: Georgia
Online Status: Offline
Posts: 102
  Quote breakbenj Quote  Post ReplyReply Direct Link To This Post Topic: Can the schedule be edited while show is playing.
    Posted: 14 Dec 2008 at 7:41pm
That's What I thought. i just stopped it and removed the sequence and set it up to resume at 8:45. Thanks
Jeff

Back to Top
Jonathan View Drop Down
Beta Testers
Beta Testers


Joined: 07 Sep 2008
Location: SoCal
Online Status: Offline
Posts: 1237
  Quote Jonathan Quote  Post ReplyReply Direct Link To This Post Posted: 14 Dec 2008 at 7:30pm
I've never successfully done it.  Each time the show schedule window (new or existing) is opened, the lights stop receiving commands.  You then have to stop the scheduler, and restart it to get it going again. 

I only make changes when my show loop has ended but before the next one begins.  I've got it set up so that there are 30 seconds in between shows with just the lights on.  If you time it right, you can get away with it. 
~Jonathan
Back to Top
breakbenj View Drop Down
Pre-Order User
Pre-Order User
Avatar

Joined: 21 Dec 2007
Location: Georgia
Online Status: Offline
Posts: 102
  Quote breakbenj Quote  Post ReplyReply Direct Link To This Post Posted: 14 Dec 2008 at 7:16pm
Can the schedule be edited while show is playing without interupting the show. I need to remove a sequence but I don't want to stop the show.
Jeff

Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down

Bulletin Board Software by Web Wiz Forums® version 9.06
Copyright ©2001-2007 Web Wiz

This page was generated in 0.313 seconds.