Aurora Homepage
Forum Home Forum Home > Aurora Sequencer Software > Aurora 1.0 > Bug Reports
  Active Topics Active Topics
  FAQ FAQ  Forum Search   Calendar   Register Register  Login Login

Error 3709

 Post Reply Post Reply
Author
Message
  Topic Search Topic Search  Topic Options Topic Options
Pony_God View Drop Down
Senior Member
Senior Member
Avatar

Joined: 01 Sep 2008
Location: Naples, FL
Online Status: Offline
Posts: 551
  Quote Pony_God Quote  Post ReplyReply Direct Link To This Post Topic: Error 3709
    Posted: 30 Nov 2008 at 3:53pm
Alright, so I've added .NET framework 2.0 to our show server to update the ACx16 controller firmware... Now, I cannot edit scheduled shows. I get an error 3709.
 
Now, I can create a new show, and edit that.... At least I can still shedule!
 
So I had to erase all shows, and re-build because I needed to add a new song.
 
Also, while I'm talking about Borealis... Why is that when I click on 11/30/08 to create a new show, does it default to the first of the month? It should default to the selected day, right?
Fine. You're so smart you rig up the lights.
D-Light users Unite!
Back to Top
LightsOnLogan View Drop Down
Admin Group
Admin Group


Joined: 11 Oct 2007
Online Status: Offline
Posts: 3187
  Quote LightsOnLogan Quote  Post ReplyReply Direct Link To This Post Posted: 30 Nov 2008 at 4:15pm
PG, that sounds like an ADODB error.  I'm not sure why the .NET framework install introduced it, but you can try the following:
 
1) Delete borealis.dat and rebuild your schedule.
 
2) If #1 doesn't work then fully uninstall (from the control panel Add/Remove Programs) Aurora and then reinstall it.
 
The date thing is a bug that will be addressed when a new date picker control is reintroduced.
Back to Top
Pony_God View Drop Down
Senior Member
Senior Member
Avatar

Joined: 01 Sep 2008
Location: Naples, FL
Online Status: Offline
Posts: 551
  Quote Pony_God Quote  Post ReplyReply Direct Link To This Post Posted: 30 Nov 2008 at 6:34pm
Well, the odd this is that I was able to create and edit any post .net install scedules, but I couldn't touch any pre-install scedules, so I couldn't get rid of the old one.
 
I just went in and cleared the entire calendar, to get rid of the old one.
 
Since I got around it, it's not holding me up, I did think that it was odd that I couldn't touch pre-.crap schedules though... Acted as if the precedure call was wrong??/ Just weird.
Something else to bug check...
Fine. You're so smart you rig up the lights.
D-Light users Unite!
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down

Bulletin Board Software by Web Wiz Forums® version 9.06
Copyright ©2001-2007 Web Wiz

This page was generated in 1.250 seconds.