|
does the scheduler send to lights |
Post Reply | Page 12> |
Author | |
breakbenj
Pre-Order User Joined: 21 Dec 2007 Location: Georgia Online Status: Offline Posts: 102 |
Quote Reply
Topic: does the scheduler send to lights Posted: 21 Nov 2008 at 11:40am |
I haven't used the scheduler with the lights hooked up so I was wondering if Aurora had to be running also in order for the lights to get the commands?
|
|
Jeff
|
|
LightChristmas
Beta Testers Joined: 15 Oct 2007 Location: Equality, IL Online Status: Offline Posts: 993 |
Quote Reply Posted: 21 Nov 2008 at 12:23pm |
Actually, its best if you DON'T have Aurora running as having the possibility of two data streams running to the same USB port can be a problem.
The scheduler (aka Borealis) is intended to run by itself. |
|
breakbenj
Pre-Order User Joined: 21 Dec 2007 Location: Georgia Online Status: Offline Posts: 102 |
Quote Reply Posted: 21 Nov 2008 at 5:51pm |
cool thanks
|
|
Jeff
|
|
christmas 01
Groupie Joined: 08 Feb 2009 Location: Male Online Status: Offline Posts: 49 |
Quote Reply Posted: 20 Sep 2009 at 10:56am |
i have a question, now that all the sequences are finished, and that i have sourced all the music and checked and double checked and triple checked everything looks good, how do i make it all work on the days of the month if you know what i mean, ie in dlight i used the scedhuler to programme my dates last year, but now ive got aurora do i still use the orignal sceduler or download something related to aurora?
cheers thanks for your help. |
|
Many hands make christmas lights work
|
|
Jonathan
Beta Testers Joined: 07 Sep 2008 Location: SoCal Online Status: Offline Posts: 1237 |
Quote Reply Posted: 20 Sep 2009 at 11:41am |
Borealis is Aurora's scheduler, and it comes with the program. You may find this Borealis tutorial handy.
|
|
~Jonathan
|
|
christmas 01
Groupie Joined: 08 Feb 2009 Location: Male Online Status: Offline Posts: 49 |
Quote Reply Posted: 20 Sep 2009 at 1:56pm |
on the tutorial the area where the dates for the month are ie 1st dec 2nd dec are coloured cream, but when i open up the scheduler on my pc here it shows dark grey, why??
|
|
Many hands make christmas lights work
|
|
Bigindian
Beta Testers Joined: 13 Oct 2007 Online Status: Offline Posts: 373 |
Quote Reply Posted: 20 Sep 2009 at 2:25pm |
The scheduler shows the last two days of November which are dark grey. The entire month of December is white. The last two days on the calender are actually the month of January. They are there as place holders more than anything else.
If you right click on a day, it is the start date of your schedule. You can select the days of the week, time to start and the time to finish.
Once that is done, add your sequences and/or opening and closing and hit start. Minimize Aurora and you are set. It will run that schedule until the last date you set.
If you start December 1 and end Jan 15, the calender will populate with the schedule.
Give it a try. Let us know what happens
cheers
|
|
The secret to creativity is knowing how to hide your sources.
Albert Einstein |
|
christmas 01
Groupie Joined: 08 Feb 2009 Location: Male Online Status: Offline Posts: 49 |
Quote Reply Posted: 20 Sep 2009 at 2:40pm |
that is what january 2010 shows all in white like you say december is suppose to
and here is the month of december, when i tell it to setup the days and right click on any day / date in december it always brings up 01/12/2009 and doesnt post the sequences ive uploaded? please help, have i not got the install correct, aurora works fine, but i dont have the pcd board or lights connected as yet does that make a difference? |
|
Many hands make christmas lights work
|
|
christmas 01
Groupie Joined: 08 Feb 2009 Location: Male Online Status: Offline Posts: 49 |
Quote Reply Posted: 20 Sep 2009 at 2:53pm |
how come it only shows as january on my scheduler? does that mean i cant use it in may??
|
|
Many hands make christmas lights work
|
|
Jonathan
Beta Testers Joined: 07 Sep 2008 Location: SoCal Online Status: Offline Posts: 1237 |
Quote Reply Posted: 20 Sep 2009 at 4:19pm |
Well, let's first clear up how dates are read. In the US, dates are read as MM/DD/YYYY, not DD/MM/YYYY as they are in Europe. So, 01/12/2009 is January 12, 2009, not December 1, 2009.
This confusion has led to a few problems with other international users. You'll want to set the date on your show computer to match the US format so the computer can properly communicate the correct date with Borealis. Next, ignore the calender itself. Due to mouseover problems on Borealis last year for a certain user <ahem, me>, Michael (the programmer) disabled the calender. Clicking on any date brings up the first available date for the month you happen to be on irregardless of what day you clicked on. So for now, ignore the calender. I want you to go to File, then select "New Schedule item". Name your show. Then manipulate the start date and end date boxes by hand using the US date format of MM/DD/YYYY. So December 1, 2009 would be 12/01/2009, and January 10, 2009 would be 01/10/2009. Then select the sequences you want to play in your loop, including a run once start sequence and a run once end sequence if you like. The start and end sequences are optional, but you need at least one song in the main loop. Once everything is the way you like it, hit Add. If it added successfully, on the month your show is scheduled to run, you will see the show name and the time listed for it to run. Once you hit the green Start button, it will wait for the next scheduled show. You do not need to have anything hooked up for this to work; the scheduler sends out the commands whether any network adapters (USB RS-485) or controllers (ACx16's) are listening to it or not. |
|
~Jonathan
|
|
Post Reply | Page 12> |
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |